Amanda Ervin, Lightmatter
Avail PM managed a high-stakes consolidation to unite Lightmatter's Boston office and separate Drydock lab facility into a single 31,752-square-foot headquarters. Facing non-negotiable lease deadlines across both existing spaces, the team executed a phased relocation plan that allowed both departments to expand while preventing operational downtime. To resolve early budget challenges, Avail PM aligned stakeholders on cost goals, tailored the design to leverage existing space layouts and coordinated with furniture vendors for extensive equipment and furniture reuse. The project's standout success was identifying vibration-sensitive lab gear during design, leading Avail PM to engage structural engineers for a targeted study and procure specialized mitigation equipment to protect critical operations during the seamless transition.
Size
31,000 sf
Team
Architect: Bergmeyer
Engineer: WB Engineers
Contractor: JDL
Furniture: COR
617.590.2951 | info@availpm.com
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.